Portfolio

Description.

Evaporators

Waste Heat Evaporator for 500 tons/day fishmeal plant, YUKR, Kunashir Island (Far East Russia)

Waste Heat Evaporator plant Customer: YUKR, Kunashir Island (Far East Russia) / ASTW Startup and commissioning was completed 2021 Fish meal factory: Capacity of approx. 500 tons/day AMOF-Fjell Process Technology AS (AMOF-Fjell) is a high technology provider of systems to fish meal industry. The signature approach in AMOF-Fjell design is that all engineering, choice of material and components is optimized for each system. AMOF-Fjell solely use sub-suppliers with a long history of quality delivery. The result makes the AMOF-Fjell systems one of the most energy efficient and reliable system in the market. In this project AMOF-Fjell have deliveriered 2 – two […]

Waste Heat Evaporator for 500 tons/day fishmeal plant, YUKR, Kunashir Island (Far East Russia) Read More »

1/4 Compact Fishmeal Plants delivered to Arkhangelsk Trawl Fleet at Vyborg yard

BARENSEVO MORE (БАРЕНЦЕВО МОРЕ) Compact Fishmeal Plant Capacity: 60T/DCustomer: Arkhangelsk Trawl Fleet – 4 off fishing vessels (stern trawlers) – Delivery 2017 – 2019 Related links: AWARDS 2020 | Best Factory Ship – Barentsevo More – Skipsteknisk – Baird Maritime Delivery to Best Factory-ship 2020 – AMOF Fjell (amof-fjell.com) Download Datasheet:

1/4 Compact Fishmeal Plants delivered to Arkhangelsk Trawl Fleet at Vyborg yard Read More »

Trawler F/T Sunderøy

Compact Fishmeal Plant retrofit delivered to fish trawler F / T Sunderøy

Fishmeal Plant retrofit F/T Sunderøy (56m) The plant is installed on fish trawler F/T Sunderøy. ISCC has recently purchased the trawler from Prestfjord AS in Sortland, Norway. The plant has a capacity of handling 48 tons of raw material per 24 hours and is designed and delivered by AMOF Fjell Process Technology AS. The plant will produce high quality marine proteins and fish oil from fish waste and cut-offs. The contract for the fishmeal plant was placed in May and the completion of delivery will be by January – 2020. Capacity: 48T/D Customer: Independent Seafood Canada Corporation Delivery 2019  May

Compact Fishmeal Plant retrofit delivered to fish trawler F / T Sunderøy Read More »

Scroll to Top